Blog Post
Professional Scrum with Kanban (PSK) - Don't just limit WIP - optimize it! (post 1 of 3)
June 21, 2018
Bottom line - WiP limits must be applied to improve flow of the delivery of value. It's a key lever to improve the performance of Professional Scrum Teams, and it's required by the Kanban Guide for Scrum.